Mulberry Riverside Drainage Improvements and Cowan/Myrtle Waterline Replacement

In 2018, storm drainage improvements were installed in Cowan and Myrtle streets near Mulberry Street and Riverside Avenue. Construction of an outfall structure near the Poudre River and Springer Natural Area was included.

Learn More

Clearview Channel Rehabilitation

Clearview Channel Rehabilitation

The Clearview Channel Rehabilitation project between Briarwood Road and Hillcrest Drive began in May 2014. Utilities Stormwater crews rebuilt the channel to repair eroded areas, prevent future erosion, improve maintenance access and enhance channel habitat.

Learn More

Boxelder Stormwater Improvements on Prospect Road

Fort Collins Utilities began construction of stormwater improvements under Prospect Road near Boxelder Creek in March 2016. At the same time, City Engineering began replacement of an existing bridge over Boxelder Creek. Both projects were built under one road closure (Prospect Road) to minimize traffic impacts.

Learn More

Spring Creek at Edora Stream Restoration

Fort Collins Utilities and City Engineering worked to replace the bridge over Spring Creek at Edora Park and improve and restore the creek.

Learn More

Dry Creek Drainage Improvement Project

Dry Creek Drainage Improvement Project

The Dry Creek Drainage Improvement Project was constructed to protect people and properties within the Dry Creek Basin and reduce or eliminate the FEMA regulatory floodplain for Dry Creek in the city limits.

Learn More

Boring during the Northeast College Corridor Outfall Project

Northeast College Corridor Outfall Phases 1 and 2

Utilities is improving storm drainage as part of the ongoing Northeast College Corridor Outfall Project (NECCO). Portions of the floodplain in the Alta Vista neighborhood were removed as a result of these improvements.

Learn More

Construction on the Canal Importation Ponds & Outfall

Canal Importation Ponds & Outfall Project

Construction on the Canal Importation Ponds & Outfall (CIPO) Drainage Improvement Project began in fall 2007. The completed project greatly reduced flood risk east of the New Mercer Ditch.

Learn More

Construction the West Vine Outfall Project

West Vine Outfall Project

In 2003, the City of Fort Collins and Larimer County adopted the West Vine Basin Master Drainage Plan. Improvements to help alleviate flooding during a 100-year storm, including detention ponds, channels, storm sewers, culverts and spill structures from the irrigation canals.

Learn More

Construction on the Plum Street Project

Plum Street Sanitary & Storm Drainage Improvements Project

In coordination with The District at Campus West development on Plum Street, Fort Collins Utilities removed, replaced and up-sized portions of the existing sanitary sewer line and storm drainage system along Plum and Shields streets and City Park Avenue.

Learn More

Lincoln/Willow Storm Sewer Upgrades

Lincoln/Willow Storm Sewer Upgrades

From January 2015 - May 2016, Fort Collins Utilities replaced old and undersized storm sewer infrastructure in the Downtown River District. The project improved drainage, added water quality treatment and increased safety for area properties and transportation systems.

Learn More

Construction on Mail Creek Stream Rehabilitation Project

Mail Creek Stream Rehabilitation Project

Stream rehabilitation and/or restoration projects repair areas of streams where the ecology, safety, structure and water quality have changed over time. The Mail Creek Project will reshape and stabilize the eroding banks along a specific section of Mail Creek to improve safety and habitat.

Learn More

Remington Street Stormwater Improvements

Remington Street Stormwater Improvements & Sewer Line Replacement

An undersized stormwater system and aging sanitary mains were replaced in Remington Street from Spring Park Drive to Prospect Road from February to August 2020. This project improved wastewater operations and drainage and flood protection in the neighborhood.

Learn More

Flooding in downtown Fort Collins

Downtown Stormwater Improvement Plan (DSIP)

Downtown Fort Collins is at risk for flooding, and pollution from urban stormwater runoff from downtown can impact the Cache la Poudre River. DSIP will address the five major stormwater projects remaining in the downtown area.

Learn More

Poudre River Bank Improvements

Poudre River Bank Improvements

Streambank erosion in recent years had resulted in an area of severe bank erosion along the Poudre River near Homestead Natural Area. Utilities construction crews started reconstruction of the damaged bank December 2019, rebuilding 250 linear feet of the riverbank along the northwest side of the Homestead Natural Area.

Learn More

Skyline Storm Sewer

The Skyline Storm Sewer Improvement project replaced an undersized deficient storm sewer in 2018 along Skyline Drive east of Crestmoore Street. This location had documented history of minor flooding. While the previous storm sewer failed to effectively convey even a 2-year storm runoff, design and construction of the new system was optimized to convey up to a 10-year storm, providing additional protection to surrounding properties and homes.

Hollywood and Irish Detention Pond

The Hollywood and Irish Stormwater Improvement Project was completed in the early 2000’s through Hazard Mitigation Grant Funding awarded to Larimer County. Homes in the area of Hollywood and Irish streets experienced severe flooding and property damage from storms in 1992, 1997 and 1999. The drainage improvements included construction of a regional detention pond, outfall channel and improvements to roadside ditches, which removed over 60 structures from the floodplain.

Sheldon Lake Drainage Improvement

This project consisted of numerous drainage improvements in the area north of Mulberry Street and west of Sheldon Lake. Additional stormwater detention was provided in the City Park Golf Course and in Sheldon Lake. Uncontrolled stormwater spills were eliminated from the New Mercer Ditch and the Larimer County Canal No. 2 between Mulberry Street and the West Vine/Canal Importation basin boundary.

West Prospect Ponds

Completed in 2006, this project included stormwater drainage improvements that eliminated overtopping of detention ponds, which resulted in more than 120 homes being removed from the 100-year floodplain. The overall project limits began at the southwest corner of West Prospect Road and Overland Trail on the City-owned property and extend north to the Minatta/CSU property line west of Overland Trail.

Scenic View and West Orchard Ponds

The 2009 West Orchard and Scenic View pond improvements were initially recommended for the Plum Channel as part of the 2001 Master Plan. Significant flooding occurred in this area within residential neighborhoods and at roadway crossings. Improvements were constructed from Kimball Road to Ponderosa Drive to mitigate flooding. Improvements alleviated unrestricted runoff and overflow spills that caused significant flooding during major storm events.


Did You Know?

Purchasing ENERGY STAR® appliances when replacing old ones helps you save energy and money without sacrificing performance.

Closing windows during summer days keeps cool air inside.

You can save water by partially fill the sink with warm water to rinse the razor blade when shaving.