Development Fees#
2023 Changes
One-time development and re-development fees increased by 9% for 2023 for electric capacity fees and water, wastewater and stormwater plant investment fees.
Plant investment and development fees support supply and infrastructure associated with new development as well as improvements to current infrastructure.
These fees (summarized from Chapter 26 of the municipal code) apply to all development served by Fort Collins Utilities, whether inside or outside city limits. Information is provided for estimation purposes only.
Electric
Water, Wastewater and Stormwater
- Water Development Fees (includes water meter fees, plant investment fees (PIFs), and Water Supply Requirements (WSRs).
- To estimate the cost associated with the Water Supply Requirements, developments will be required to submit a Water Fee Form with the Final Development Plan (FDP). Information in the form should reference the information that is submitted on the corresponding plans (e.g., Landscape plan, Irrigation Plan, Utility Plan). Learn more about the Water Supply Requirements.
Development Review Charges (vary based on utility)
- Electric review charges are included in electric development fees.
- Water, wastewater and stormwater fees are collected through the review process.
- Learn more about Development Review Fees.
Did You Know?
Opening windows on summer evenings brings in cool outdoor air.
The watersheds where our water comes from drain snowmelt and rainfall to the Cache la Poudre and Big Thompson rivers and Horsetooth Reservoir.
Permanent "duct mastic" material – not duct tape – should be used for sealing attic ductwork and crawl spaces.