Skip to main content

Electric Development Fee Estimator#

You must select a service amperage!


You must select a service amperage!


Electric capacity estimate
The ECF shall be determined based on the amps for each proposed meter, calculated individually then aggregated, and the ECF charges in effect at the time of full payment:
Building Site Estimate

Total Estimated Fees:

123

NOTE:
100% of above total is payable prior to scheduling electric construction.

Building site charges for installation of electric service to the building (typically /building) are paid at the time of building permit.

Electric service to the building is installed, owned, and maintained by the owner.

Electric Capacity Estimate Detail:

Building Site Estimate Detail:



NOTE:
Secondary service from the transformer to the building is provided, installed and maintained by the owner.

Did You Know?

You can save money by shifting your electric use to the lower-priced, off-peak hours or by reducing your overall use.

Only pee, poo and toilet paper should be flushed. Everything else should be thrown in the trash.

You can save water when washing smaller loads by selecting the setting for the corresponding water level.