Poudre Canyon Waterline Assessment

Inspecting a 24-inch water pipeline in the Poudre Canyon

Fort Collins Utilities, with Hydro Construction and Stantec Consultants, will be performing inspections on a 24-inch water pipeline from the mouth of the Poudre Canyon to Gateway Park, approximately 3.5 miles. Traffic will not be impacted.

Contact Information
Contact: Brian Mulligan
Project Manager
970-373-8804
Ym11bGxpZ2FuQGZjZ292LmNvbQ==
https://www.fcgov.com/utilities/what-we-do/construction-projects/poudre-canyon-waterline-assessment

  Back to News/Events/Projects List

Projects

Poudre Canyon Waterline Assessment

Inspecting a 24-inch water pipeline in the Poudre Canyon

Fort Collins Utilities, with Hydro Construction and Stantec Consultants, will be performing inspections on a 24-inch water pipeline from the mouth of the Poudre Canyon to Gateway Park, approximately 3.5 miles. Traffic will not be impacted.


CONTACT INFORMATION
Contact: Brian Mulligan
Project Manager
970-373-8804
Ym11bGxpZ2FuQGZjZ292LmNvbQ==
/utilities/what-we-do/construction-projects/poudre-canyon-waterline-assessment


Back to News/Events/Projects List
Report a Problem

Tip #166

Apply for low-cost financing to make higher-cost upgrades.