Skip to main content

US 287 / SH 14 Access Management Report#

The US 287/SH 14 Access Management Plan was developed to address future transportation and land use changes to within the North College, Jefferson/Riverside, and Mulberry Corridor. The access-related improvements are designed to enhance the safety and operations along this important local and regional corridor.

Title Description Format/Size Link
US 287 / SH 14 - Cover, TOC, and Executive Summary 18 pages: Includes cover, table of contents, and executive summary. 1.34 MB View and Print

US 287 / SH 14 - Chapter 1

4 pages: Introduction to the report, which has subcategories of background, coordination, involvement, and the report format. 103 KB View and Print
US 287 / SH 14 - Chapter 2 5 pages: This chapter includes access objectives, principles and strategies along with an access issue example. 757 KB View and Print

US 287 / SH 14 - Chapter 3 (N. College Ave)

21 pages: This chapter includes the existing conditions, inventory of the access points, and traffic conditions. 754 KB View and Print
US 287 / SH 14 - Chapter 3 continued 6 pages: This section contains the short-term and long-range recommendations for the access control plan. 523 KB View and Print
US 287 / SH 14 - Chapter 3 continued 12 pages: Four pages of maps for N. College Ave., and the cost estimates can also be found. 2.69 MB View and Print
US 287 / SH 14 - Chapter 4 (Jefferson St/ Riverside Ave) 22 pages: This chapter includes the existing conditions of the road, inventory of the access points, current and projected traffic conditions. 1.92 MB View and Print

US 287 / SH 14 - Chapter 5 (Mulberry St)

17 pages: Chapter includes the existing conditions on Mulberry St., inventory of the access points, and current and projected traffic conditions. 586 MB View and Print
US 287 / SH 14 - Chapter 5 continued 4 pages: Chapter includes the access control plan and three maps of Mulberry St. 2.42 MB View and Print
US 287 / SH 14 - Chapter 5 continued 8 pages: Section contains three more maps of Mulberry. This section also has the cost estimate. 3.47 MB View and Print
US 287 / SH 14 - Chapter 6 1 page: Implementation of Access Control Plan 27.1 KB View and Print
US 287 / SH 14 - Appendix A 3 pages: Contains the existing access points for N. College Ave. 54.2 KB View and Print
US 287 / SH 14 - Appendix B 2 pages: Contains the existing access points for Jefferson St/ Riverside Ave. 35.2 KB View and Print
US 287 / SH 14 - Appendix C 4 pages: Contains the existing access points for Mulberry St. 58.3 KB View and Print
US 287 / SH 14 - Appendix D 5 pages: Contains the public outreach summary. 1.47 MB View and Print
US 287 / SH 14 - Appendix E 1 page: Contains the project team members 21.4 KB View and Print
US 287 / SH 14 - Appendix F 6 pages: Contains the access issue photo-log 1.42 MB View and Print
US 287 / SH 14 - Appendix G 3 pages: Contains the accident history diagrams. Two maps are included in this section for N. College Ave. 2.44 MB View and Print
US 287 / SH 14 - Appendix G continued 2 pages: Maps included in this section for Jefferson St./ Riverside Ave., and E. Mulberry St. 1.90 MB View and Print
US 287 / SH 14 - Appendix G continued 2 pages: Maps included in this section for E. Mulberry St. 1.75 MB View and Print
US 287 / SH 14 - Appendix H 2 pages: Contains a reference to the City of Fort Collins Master Street Plan (amended April 4, 2000), and a Master Street Plan Map. 1.06 MB View and Print