Clearview Stormwater Channel Improvements Project

Channel maintenance for neighborhood safety.

Two improvement projects are coming soon to the Briarwood neighborhood stormwater channel: tree removal and channel rehabilitation.

Following severe neighborhood flooding in 1997, the City built Clearview Channel in 2000 to move stormwater east to the detention pond in Avery Park. The channel is in a very narrow easement and maintenance access is difficult.

Contact Information
Contact: Mark Taylor
Civil Engineer
970-416-2494
bXRheWxvckBmY2dvdi5jb20=
www.fcgov.com/clearview-channel

  Back to News/Events/Projects List

Projects

Clearview Stormwater Channel Improvements Project

Channel maintenance for neighborhood safety.

Two improvement projects are coming soon to the Briarwood neighborhood stormwater channel: tree removal and channel rehabilitation.

Following severe neighborhood flooding in 1997, the City built Clearview Channel in 2000 to move stormwater east to the detention pond in Avery Park. The channel is in a very narrow easement and maintenance access is difficult.


CONTACT INFORMATION
Contact: Mark Taylor
Civil Engineer
970-416-2494
bXRheWxvckBmY2dvdi5jb20=
www.fcgov.com/clearview-channel


Back to News/Events/Projects List
Report a Problem

Tip #150

Check temperatures in your refrigerator (recommended 38-40 degrees Fahrenheit) and freezer (recommended 0 degrees Fahrenheit); adjust as needed.

More Tips

Fort Collins Utilities Non-Discrimination Statement

Close