Website home about our city
US 287 / South College Avenue Bicycle Lane Project

With the collaboration of the Colorado Department of Transportation (CDOT) and the City of Fort Collins, plans to expand access to existing and planned on-street bicycle lane and off-road multi-use paths have been created in 2004/05. In addition, this project will improve bicycle access to transit routes along South College.

Title Description
Format/Size
Link
US 287 Bicycle Lane- Cover and Table of Contents 5 pages: Cover page, table of contents with the the list of figures, tables, and appendices.
pdf
214 kb
US 287 Bicycle Lane - Sections I to V 18 pages: This includes the introduction, existing conditions, vision plan, bicycle lane treatments, and conceptual design plan.
pdf
754 kb
US 287 Bicycle Lane - Conceptual Design Plan Figures 2 pages: Maps of College intersecting Carpenter Rd., and College crossing Victoria Dr.
pdf
874 kb
US 287 Bicycle Lane - Conceptual Design Plan Figures 2 pages: Maps of College intersecting Triangle Dr., and College and the Cottonwood Club.
pdf
886 kb
US 287 Bicycle Lane - Conceptual Design Plan Figures 2 pages: Maps of College intersecting Trilby Rd., and College intersecting Skyway Dr.
pdf
1.10 mb
US 287 Bicycle Lane - Conceptual Design Plan Figures 2 pages: Maps of College intersecting Saturn Dr., and College intersecting Bueno Dr.
pdf
917 kb
US 287 Bicycle Lane - Conceptual Design Plan Figures 2 pages: Maps of College crossing Fossil Creek, and College intersecting Fossil Creek Pkwy.
pdf
980 kb
US 287 Bicycle Lane - Conceptual Design Plan Figures 2 pages: Maps of College south of Harmony, and College intersecting Harmony Rd.
pdf
905 kb
US 287 Bicycle Lane - Sections VI to X 12 pages: This includes the public involvement process, prioritization, additional project requirements, phase 1 construction project, and future steps.
pdf
89.5 kb
US 287 Bicycle Lane - Appendix A1 14 pages: Appendix A1 includes the project path, the schedule, seven different options, and the first open house summary.
pdf
1.79 mb
US 287 Bicycle Lane - Appendix A2 9 pages: Appendix A2 includes the seven treatment options from appendix A1, and the second open house summary.
pdf
1.04 mb
US 287 Bicycle Lane - Appendix A3 17 pages: Appendix A3 contains information about the project summary, and the final open house summary.
pdf
3.68 mb