With the collaboration of the Colorado Department of Transportation (CDOT) and the City of Fort Collins, plans to expand access to existing and planned on-street bicycle lane and off-road multi-use paths have been created in 2004/05. In addition, this project will improve bicycle access to transit routes along South College.
| Title | Description |
Format/Size
|
Link
|
| US 287 Bicycle Lane- Cover and Table of Contents | 5 pages: Cover page, table of contents with the the list of figures, tables, and appendices. |
214 kb |
|
| US 287 Bicycle Lane - Sections I to V | 18 pages: This includes the introduction, existing conditions, vision plan, bicycle lane treatments, and conceptual design plan. |
754 kb |
|
| US 287 Bicycle Lane - Conceptual Design Plan Figures | 2 pages: Maps of College intersecting Carpenter Rd., and College crossing Victoria Dr. |
874 kb |
|
| US 287 Bicycle Lane - Conceptual Design Plan Figures | 2 pages: Maps of College intersecting Triangle Dr., and College and the Cottonwood Club. |
886 kb |
|
| US 287 Bicycle Lane - Conceptual Design Plan Figures | 2 pages: Maps of College intersecting Trilby Rd., and College intersecting Skyway Dr. |
1.10 mb |
|
| US 287 Bicycle Lane - Conceptual Design Plan Figures | 2 pages: Maps of College intersecting Saturn Dr., and College intersecting Bueno Dr. |
917 kb |
|
| US 287 Bicycle Lane - Conceptual Design Plan Figures | 2 pages: Maps of College crossing Fossil Creek, and College intersecting Fossil Creek Pkwy. |
980 kb |
|
| US 287 Bicycle Lane - Conceptual Design Plan Figures | 2 pages: Maps of College south of Harmony, and College intersecting Harmony Rd. |
905 kb |
|
| US 287 Bicycle Lane - Sections VI to X | 12 pages: This includes the public involvement process, prioritization, additional project requirements, phase 1 construction project, and future steps. |
89.5 kb |
|
| US 287 Bicycle Lane - Appendix A1 | 14 pages: Appendix A1 includes the project path, the schedule, seven different options, and the first open house summary. |
1.79 mb |
|
| US 287 Bicycle Lane - Appendix A2 | 9 pages: Appendix A2 includes the seven treatment options from appendix A1, and the second open house summary. |
1.04 mb |
|
| US 287 Bicycle Lane - Appendix A3 | 17 pages: Appendix A3 contains information about the project summary, and the final open house summary. |
3.68 mb |