View the CIPO timeline » (PDF 223KB)
Construction of detention basins will include typical large excavation and hauling equipment.
The project consists of two major components: stormwater detention (storing water) and stormwater Four existing stormwater detention areas will be enlarged, including:
Two new basins will be created at Glenmoor Detention Basin and Kane Detention Basin.
Large pipe construction in a residential street
Pipe in street before repaving
Large equipment is necessary for large pipe projects
Typical inlets after construction |