CIPO Construction Timeline
2007 2008 2009 2010
arrow City of Fort Collins Image arrow
  • Complete CIPO project design.
  • Begin construction in existing Red Fox Meadows and Fairbrooke basins, and new Kane Detention Basin.
  • Construct Kane, Red Fox Meadows and Fairbrooke Detention Basins.
  • Begin restoration of areas disturbed by construction and all affected natural areas.
  • Construct outfall structure at Red Fox Meadows.
  • Construct large pipe from outfall, across Prospect Road to Castlerock Drive.
  • Construct storm sewers and inlets at Taft Hill Road and Suffolk Street.
  • Complete restoration of Kane, Red Fox Meadows and Fairbrooke Detention Basins.
  • Construct large storm sewer pipe and inlet system from Prospect Road north to Glenmoor Detention Basin.
  • Construct storm sewer and inlets at Springfield Drive.
  • Construct new Glenmoor Detention Basin.
  • Modifiy existing Avery and Plum Ponds.
Photo - soil hauling truck

Construction of detention basins will include typical large excavation and hauling equipment.

The project consists of two major components: stormwater detention (storing water) and stormwater
conveyance (moving the water).

Four existing stormwater detention areas will be enlarged, including:

  • Plum Detention Basin;
  • Avery Pond;
  • Fairbrooke Detention Basin; and
  • Red Fox Meadows Detention Basin.

Two new basins will be created at Glenmoor Detention Basin and Kane Detention Basin.

  • Excavation of the detention areas will generate many thousands of cubic yards of material that will be hauled away in trucks to a location yet to be determined.
  • An outfall structure and water quality pond will be built at Red Fox Meadows. Basins, ponds and other affected natural areas and wildlife habitat will be preserved or restored.
  • An extensive large-diameter stormwater pipe (ranging from 60 to 102 inches) and inlet system will move the storm water into the detention basins.
  • Inlets and storm sewers will be constructed at South Taft Hill Road and Suffolk Street and drain to Fairbrooke Detention Basin.
Pipe construction

Large pipe construction in a residential street

Pipe in street

Pipe in street before repaving

Equip pipe people

Large equipment is necessary for large pipe projects

inlets

Typical inlets after construction

CIPO
Related Documents