Skip to main content
Departments Streets Concrete & Asphalt
Note: denotes a purchasing card expense.
Vendor/Payee Comments Date Amount
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt May-03-2016 $383,164.67
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Aug-19-2015 $135,000.00
VOGEL CONCRETE INC - VGL INC-
[P.O. # 9140734]
2014 Crack Seal Contract Dec-16-2014 $133,540.23
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Oct-15-2014 $112,468.26
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-20-2014 $97,028.68
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Aug-10-2015 $93,777.07
CONNELL RESOURCES INC
[P.O. # 9140419]
Asphalt Oct-20-2014 $93,573.28
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Sep-21-2015 $84,255.57
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-25-2014 $83,539.52
CONNELL RESOURCES INC
[P.O. # 9140419]
Concrete & Asphalt Jul-14-2014 $74,644.55
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Oct-06-2014 $74,000.00
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Sep-22-2015 $70,988.36
CONNELL RESOURCES INC
[P.O. # 9140419]
Concrete & Asphalt Jul-02-2014 $69,594.78
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-19-2014 $65,679.51
CONNELL RESOURCES INC
[P.O. # 9140419]
Concrete & Asphalt Jul-02-2014 $63,053.79
BANNER CONCRETE
[P.O. # 9155290]
1385-COLLEGE & MONROE IMPROVE Aug-26-2015 $59,604.79
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $57,068.08
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Sep-29-2015 $54,318.41
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-10-2014 $53,145.36
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Aug-12-2015 $53,052.20
VOGEL CONCRETE INC -VGL INC- (
[P.O. # 9140734]
2014 Crack Seal Contract Aug-08-2014 $52,958.10
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jun-17-2015 $49,274.04
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Aug-31-2015 $46,624.59
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-25-2014 $44,265.34
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt Jun-28-2016 $42,945.98
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-25-2014 $42,679.02
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-25-2014 $42,552.30
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Jul-01-2015 $42,332.12
VOGEL CONCRETE INC - VGL INC-
[P.O. # 9140734]
2014 Crack Seal Contract Nov-10-2014 $41,743.15
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jul-28-2015 $40,187.50
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-10-2014 $39,003.92
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-29-2014 $38,312.75
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt May-24-2016 $38,054.97
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-10-2014 $37,523.98
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $36,196.43
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-29-2014 $35,425.60
VOGEL CONCRETE INC - VGL INC-
[P.O. # 9140734]
2014 Crack Seal Contract Oct-09-2014 $34,434.44
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jul-01-2015 $33,960.02
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-25-2014 $33,336.51
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt May-18-2015 $33,202.60
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jun-22-2015 $32,851.93
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $32,352.51
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Sep-01-2015 $31,250.47
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Jun-24-2015 $31,039.30
VOGEL CONCRETE INC (ACH)
[P.O. # 9140734]
2014 Crack Seal Contract Jul-07-2014 $30,570.06
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 May-10-2016 $29,812.33
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Dec-09-2014 $29,701.41
CONNELL RESOURCES INC
[P.O. # 9160264]
Concrete & Asphalt May-10-2016 $29,520.55
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt May-24-2016 $29,093.19
VOGEL CONCRETE INC - VGL INC-
[P.O. # 9140734]
2014 Crack Seal Contract Sep-09-2014 $27,671.79
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-19-2014 $27,424.07
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Aug-25-2015 $26,466.30
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Aug-12-2015 $25,971.37
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt May-18-2015 $25,523.30
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Sep-08-2015 $25,000.00
MAXWELL PRODUCTS INC
[P.O. # 9151919]
48,000 LBS NUVO CS-B @$.53/lb Apr-13-2015 $24,959.29
MAXWELL PRODUCTS INC
[P.O. # 9154113]
48,000 LBS NUVO CS-B @ $.53/lb Aug-18-2015 $24,924.31
MAXWELL PRODUCTS INC
[P.O. # 9145282]
50,000 LBS NUVO CS@.53/LB Sep-15-2014 $24,843.75
MAXWELL PRODUCTS INC
[P.O. # 9156435]
Nuvo CS B Oct-14-2015 $24,714.96
MAXWELL PRODUCTS INC
[P.O. # 9156435]
Nuvo CS B Oct-20-2015 $24,714.96
MAXWELL PRODUCTS INC
[P.O. # 9143778]
50,000 LBS NUVO CS-C Jul-21-2014 $24,701.71
MAXWELL PRODUCTS INC
[P.O. # 9153741]
48,000 LBS NUVO CS-B @$.53/LB Jul-01-2015 $24,690.50
MAXWELL PRODUCTS INC
[P.O. # 9151105]
48,000 LBS NUVO CS-B @$0.53/LB Feb-23-2015 $24,571.33
MAXWELL PRODUCTS INC
[P.O. # 9161401]
48,000 LBS NUVO CS-B Mar-07-2016 $24,325.41
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-10-2014 $24,269.86
MAXWELL PRODUCTS INC
[P.O. # 9152770]
48,000 LBS NUVO CS-B @$.53/lb May-12-2015 $24,182.84
MAXWELL PRODUCTS INC
[P.O. # 9155282]
48,000 LBS NUVO CS-B Aug-26-2015 $24,144.15
MAXWELL PRODUCTS INC
[P.O. # 9153133]
NUVO CS-B - 48,000 LBS@$.53/LB Jun-08-2015 $24,092.21
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt May-20-2015 $23,877.68
MAXWELL PRODUCTS INC
[P.O. # 9145781]
50,000 LBS NUVO CS-B@$.53/LB Oct-15-2014 $23,345.97
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Oct-27-2014 $22,913.62
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 Jun-14-2016 $22,830.44
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt May-28-2015 $22,546.44
MAXWELL PRODUCTS INC
[P.O. # 9161684]
48,000 lbs NUVO CS-B Mar-15-2016 $22,334.88
MAXWELL PRODUCTS INC
[P.O. # 9162043]
48,000 LBS NUVO CS-B Apr-06-2016 $22,311.84
MAXWELL PRODUCTS INC
[P.O. # 9162708]
48,000 LBS NUVO CS-B May-04-2016 $22,249.92
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-17-2014 $21,822.23
CONNELL RESOURCES INC
[P.O. # 9160264]
Concrete & Asphalt Apr-19-2016 $21,684.69
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $21,633.21
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt May-26-2016 $20,376.59
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt May-18-2015 $19,442.70
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jul-28-2015 $18,140.14
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-27-2014 $17,886.09
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Sep-10-2015 $17,550.38
CONNELL RESOURCES INC
[P.O. # 9160264]
Concrete & Asphalt Jun-30-2016 $17,375.77
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 Jun-14-2016 $16,784.99
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt Jun-14-2016 $16,691.51
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jun-17-2015 $16,544.47
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 Jun-14-2016 $15,851.83
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Nov-10-2015 $15,553.98
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Oct-13-2015 $14,965.38
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Aug-18-2015 $14,854.57
CONNELL RESOURCES INC
[P.O. # 9140419]
2014 ASPHALT Jul-30-2014 $14,520.49
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $14,520.49
MORTENSON CONSTRUCTION
[P.O. # 9151772]
Old Town Square Construction Aug-03-2015 $14,510.00
CONNELL RESOURCES INC
[P.O. # 9140419]
Asphalt Jul-14-2014 $14,308.59
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT May-18-2015 $14,153.22
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-25-2014 $14,134.42
MORTENSON CONSTRUCTION
[P.O. # 9151772]
Old Town Square Construction Aug-04-2015 $13,784.50
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Sep-22-2015 $13,236.64
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-25-2014 $12,940.87
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Aug-12-2015 $12,777.90
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Oct-15-2014 $12,422.58
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Aug-18-2015 $12,158.71
CONNELL RESOURCES INC
[P.O. # 9140419]
Asphalt Jul-21-2014 $11,810.23
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Nov-18-2015 $11,370.64
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Oct-21-2015 $10,636.39
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Nov-18-2014 $10,611.45
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-25-2014 $10,335.91
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT May-18-2015 $10,023.13
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Sep-16-2015 $9,862.93
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Apr-22-2015 $9,829.32
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 Jun-01-2016 $9,790.80
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 May-24-2016 $9,615.73
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt Jan-11-2016 $9,003.09
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Nov-03-2015 $8,910.93
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Sep-21-2015 $8,892.65
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-25-2014 $8,561.78
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 Jun-01-2016 $8,544.81
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Oct-20-2015 $8,453.99
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt May-28-2015 $8,150.76
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Jul-01-2014 $7,974.25
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Apr-13-2015 $7,949.15
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Sep-08-2015 $7,915.77
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-25-2014 $7,721.05
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-20-2014 $7,641.27
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Dec-15-2015 $7,606.98
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Nov-19-2015 $7,545.15
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Dec-22-2014 $7,219.73
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-29-2014 $7,210.82
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-27-2014 $6,968.07
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 Jun-20-2016 $6,798.62
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt May-18-2015 $6,787.97
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Oct-21-2015 $6,623.83
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Oct-13-2015 $6,615.95
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 May-03-2016 $6,580.09
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Dec-11-2014 $6,560.85
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Sep-29-2015 $6,245.78
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-10-2014 $6,226.27
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jul-08-2015 $6,149.50
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 May-24-2016 $6,105.72
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Nov-12-2015 $6,105.11
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jun-17-2015 $6,014.20
CONNELL RESOURCES INC
[P.O. # 9140419]
Concrete & Asphalt Jul-21-2014 $6,000.00
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Nov-03-2015 $5,977.27
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Jul-23-2014 $5,742.27
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Dec-22-2014 $5,730.04
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Jul-21-2015 $5,723.82
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Nov-03-2014 $5,602.59
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt Jun-14-2016 $5,579.69
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Aug-17-2015 $5,577.22
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jun-23-2015 $5,513.28
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Apr-06-2015 $5,433.42
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jun-22-2015 $5,400.42
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Nov-03-2014 $5,377.67
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-19-2014 $5,375.19
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Aug-26-2015 $5,337.75
BANNER CONCRETE
[P.O. # 9155858]
INV 1434-COLLEGE & MONROE IMP Sep-21-2015 $5,309.53
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-29-2014 $5,171.08
CONNELL RESOURCES INC
[P.O. # 9160264]
2016 ASPHALT-BID 7377 Apr-11-2016 $5,139.70
COLORADO ASPHALT SERVICES INC
[P.O. # 9161420]
2016 MATERIALS Feb-29-2016 $5,000.40
CONNELL RESOURCES INC
[P.O. # 9150187]
2015 ASPHALT PER Sep-08-2015 $4,999.02
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-23-2014 $4,851.88
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Dec-08-2015 $4,755.20
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jun-17-2015 $4,648.84
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt Jun-28-2016 $4,591.59
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Dec-03-2015 $4,522.01
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Jul-17-2014 $4,511.46
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-25-2014 $4,492.55
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Dec-03-2015 $4,479.11
COLORADO ASPHALT SERVICES INC
[P.O. # 1407564]
0038273 Aug-25-2014 $4,380.75
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Oct-20-2014 $4,288.95
CONNELL RESOURCES INC
[P.O. # 9140419]
Concrete & Asphalt Jul-30-2014 $4,249.74
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $4,249.74
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt Jun-20-2016 $4,229.56
COLORADO ASPHALT SERVICES INC
[P.O. # 1502320]
0039840 Mar-17-2015 $4,220.10
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-10-2014 $4,216.46
COLORADO ASPHALT SERVICES INC
[P.O. # 1502658]
0039956 Mar-25-2015 $4,199.85
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 May-03-2016 $4,199.63
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-10-2014 $4,180.38
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Jul-17-2014 $4,180.19
CONNELL RESOURCES INC
[P.O. # 9150187]
2015 ASPHALT PER May-05-2015 $4,109.59
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-20-2014 $4,106.63
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt Apr-26-2016 $4,076.63
COLORADO ASPHALT SERVICES INC
[P.O. # 1507460]
0040698 Aug-26-2015 $4,050.00
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Nov-12-2015 $4,000.00
MARTIN MARIETTA MATERIALS
[P.O. # 1510021]
16463160 Nov-12-2015 $3,985.85
CONNELL RESOURCES INC
[P.O. # 9140419]
2014 ASPHALT Jul-30-2014 $3,938.84
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $3,938.84
CONNELL RESOURCES INC
[P.O. # 9150187]
2015 ASPHALT PER Apr-21-2015 $3,910.39
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-17-2014 $3,838.30
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Jul-09-2015 $3,812.61
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $3,776.19
CONNELL RESOURCES INC
[P.O. # 9140419]
Concrete & Asphalt Aug-05-2014 $3,766.45
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Oct-13-2015 $3,706.37
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Sep-10-2015 $3,647.45
CONNELL RESOURCES INC
[P.O. # 9140419]
2014 ASPHALT Oct-20-2014 $3,646.17
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Jun-24-2015 $3,617.71
COLORADO ASPHALT SERVICES INC
[P.O. # 1501920]
0039764 Mar-02-2015 $3,616.65
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Sep-16-2015 $3,613.42
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jun-22-2015 $3,569.85
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Oct-15-2014 $3,560.88
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Jun-17-2015 $3,544.12
MARTIN MARIETTA MATERIALS
[P.O. # 1411232]
14408340 Dec-15-2014 $3,498.57
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Jul-08-2015 $3,491.00
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Jul-23-2014 $3,489.17
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Jun-04-2015 $3,481.22
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-23-2014 $3,476.07
COLORADO ASPHALT SERVICES INC
[P.O. # 1509253]
0041648 Oct-19-2015 $3,462.75
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Dec-11-2014 $3,460.15
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Oct-06-2014 $3,441.88
COLORADO ASPHALT SERVICES INC
[P.O. # 9163259]
2016 MATERIALS May-25-2016 $3,424.95
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 Apr-26-2016 $3,414.48
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Aug-26-2015 $3,392.85
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Nov-03-2015 $3,379.78
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt May-03-2016 $3,372.66
COLORADO ASPHALT SERVICES INC
[P.O. # 9162041]
2016 MATERIALS Mar-31-2016 $3,365.55
COLORADO ASPHALT SERVICES INC
[P.O. # 9160877]
2016 MATERIALS Feb-02-2016 $3,362.85
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Aug-26-2015 $3,359.02
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Jun-04-2015 $3,348.34
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 Jun-20-2016 $3,336.58
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Nov-19-2015 $3,325.41
COLORADO ASPHALT SERVICES INC
[P.O. # 1509471]
0041720 Oct-26-2015 $3,291.30
COLORADO ASPHALT SERVICES INC
[P.O. # 9161655]
2016 MATERIALS Mar-14-2016 $3,291.30
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Aug-19-2015 $3,289.12
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Oct-21-2015 $3,216.28
CONNELL RESOURCES INC
[P.O. # 9160264]
Concrete & Asphalt May-26-2016 $3,184.77
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-10-2014 $3,171.01
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt May-18-2015 $3,135.69
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Oct-13-2015 $3,127.46
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 Apr-26-2016 $3,116.82
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jul-01-2015 $3,084.71
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Oct-13-2015 $3,021.63
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-29-2014 $3,007.47
COLORADO ASPHALT SERVICES INC
[P.O. # 1510401]
0041958 Nov-23-2015 $2,945.70
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Oct-27-2015 $2,941.95
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Sep-21-2015 $2,928.57
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jul-30-2015 $2,871.42
COLORADO ASPHALT SERVICES INC
[P.O. # 9150515]
2015 MATERIALS Jan-21-2015 $2,862.00
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 Apr-19-2016 $2,841.71
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt May-18-2015 $2,828.58
COLORADO ASPHALT SERVICES INC
[P.O. # 1500778]
00039483 Jan-21-2015 $2,822.85
COLORADO ASPHALT SERVICES INC
[P.O. # 1500161]
0039338 Jan-06-2015 $2,795.85
CONNELL RESOURCES INC
[P.O. # 9150187]
2015 ASPHALT PER Jul-21-2015 $2,763.68
COLORADO ASPHALT SERVICES INC
[P.O. # 9147252]
addendum to PO Dec-08-2014 $2,756.70
CONNELL RESOURCES INC
[P.O. # 1507280]
40321 Aug-19-2015 $2,704.64
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Dec-09-2014 $2,657.29
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt May-24-2016 $2,642.85
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt May-28-2015 $2,598.91
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-27-2014 $2,596.04
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jun-17-2015 $2,594.18
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Sep-15-2015 $2,592.87
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 Jun-14-2016 $2,552.25
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Jun-17-2015 $2,543.99
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jun-22-2015 $2,542.86
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Oct-07-2014 $2,535.72
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Oct-13-2015 $2,486.28
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt May-10-2016 $2,432.94
CONNELL RESOURCES INC
[P.O. # 9160264]
Concrete & Asphalt Apr-11-2016 $2,431.61
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Oct-20-2014 $2,428.56
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Aug-12-2015 $2,417.80
CONNELL RESOURCES INC
[P.O. # 9140419]
2014 ASPHALT Dec-18-2014 $2,417.62
CONNELL RESOURCES INC
[P.O. # 9140419]
2014 ASPHALT Aug-25-2014 $2,409.19
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Apr-22-2015 $2,365.10
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Aug-19-2015 $2,341.43
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Jul-01-2014 $2,328.57
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Jun-22-2015 $2,318.61
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Sep-21-2015 $2,314.29
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Sep-29-2015 $2,261.76
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 Jun-01-2016 $2,219.74
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Sep-01-2015 $2,214.30
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-10-2014 $2,212.27
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $2,206.72
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jul-01-2015 $2,199.99
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Nov-13-2014 $2,183.32
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $2,143.05
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Aug-17-2015 $2,142.87
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-25-2014 $2,128.56
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jul-21-2015 $2,128.56
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Jul-30-2015 $2,102.40
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Oct-20-2014 $2,100.27
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt Jun-01-2016 $2,092.86
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 Apr-19-2016 $2,082.80
MARTIN MARIETTA MATERIALS
[P.O. # 1600257]
16719961 Jan-07-2016 $2,077.08
CONNELL RESOURCES INC
[P.O. # 9140419]
Asphalt Jul-30-2014 $2,070.79
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $2,070.79
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Aug-12-2015 $2,068.37
CONNELL RESOURCES INC
[P.O. # 9140419]
Asphalt Jul-30-2014 $2,059.03
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $2,059.03
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Dec-22-2014 $2,050.23
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Jul-28-2015 $2,036.41
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Aug-17-2015 $2,028.57
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt May-28-2015 $2,021.43
CONNELL RESOURCES INC
[P.O. # 1406329]
37739 Jul-21-2014 $1,966.90
COLORADO ASPHALT SERVICES INC
[P.O. # 9162724]
2016 MATERIALS May-04-2016 $1,942.65
CONNELL RESOURCES INC
[P.O. # 9160264]
2016 ASPHALT-BID 7377 Apr-19-2016 $1,928.59
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Aug-12-2015 $1,919.39
CONNELL RESOURCES INC
[P.O. # 9140419]
2014 ASPHALT Nov-10-2014 $1,911.96
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Jul-30-2015 $1,891.17
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Sep-16-2015 $1,891.17
CONNELL RESOURCES INC
[P.O. # 9140419]
2014 ASPHALT Nov-18-2014 $1,849.14
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Jul-17-2014 $1,848.54
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Sep-10-2015 $1,846.76
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt Apr-11-2016 $1,842.87
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Aug-26-2015 $1,837.63
MARTIN MARIETTA MATERIALS
[P.O. # 1600257]
16719975 Jan-07-2016 $1,832.65
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Sep-10-2015 $1,812.73
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Sep-15-2015 $1,802.77
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt Jun-20-2016 $1,787.19
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Nov-18-2014 $1,783.96
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jun-22-2015 $1,769.98
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Nov-03-2014 $1,769.43
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Nov-18-2015 $1,759.04
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Jul-17-2014 $1,742.85
MARTIN MARIETTA MATERIALS
[P.O. # 1411555]
14475363 Dec-23-2014 $1,736.62
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Aug-18-2015 $1,735.71
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Apr-22-2015 $1,727.65
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Oct-27-2015 $1,718.94
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Jun-17-2015 $1,713.57
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Apr-01-2015 $1,707.15
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Sep-10-2015 $1,694.87
BRANNAN SAND & GRAVEL CO / REA
[P.O. # 1601567]
157506 Feb-16-2016 $1,687.85
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-29-2014 $1,657.44
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-19-2014 $1,645.87
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt May-28-2015 $1,642.58
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jun-22-2015 $1,635.11
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt Apr-26-2016 $1,633.44
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT May-28-2015 $1,624.32
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-30-2014 $1,621.44
CONNELL RESOURCES INC
[P.O. # 9140419]
Concrete & Asphalt Jul-30-2014 $1,592.85
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $1,592.85
MARTIN MARIETTA MATERIALS
[P.O. # 1411518]
14447041 Dec-22-2014 $1,515.35
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-10-2014 $1,498.11
BANNER CONCRETE
[P.O. # 1507327]
1386 Aug-25-2015 $1,497.50
CONNELL RESOURCES INC
[P.O. # 9140419]
2014 ASPHALT Aug-05-2014 $1,463.43
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt May-10-2016 $1,462.88
CONNELL RESOURCES INC
[P.O. # 9140419]
2014 ASPHALT Nov-18-2014 $1,441.52
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Apr-22-2015 $1,432.59
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Nov-18-2014 $1,427.82
CONNELL RESOURCES INC
[P.O. # 9140419]
2014 ASPHALT Nov-10-2014 $1,412.79
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Jul-17-2014 $1,388.76
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT May-18-2015 $1,377.81
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Sep-10-2015 $1,334.38
CONNELL RESOURCES INC
[P.O. # 9150187]
2015 ASPHALT PER Jul-21-2015 $1,327.56
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Apr-22-2015 $1,306.84
CONNELL RESOURCES INC
[P.O. # 9150187]
2015 ASPHALT PER Aug-12-2015 $1,301.12
CONNELL RESOURCES INC
[P.O. # 9160264]
2016 ASPHALT-BID 7377 Jun-14-2016 $1,299.85
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Apr-13-2015 $1,291.94
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-10-2014 $1,273.65
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Dec-03-2015 $1,270.06
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Dec-14-2015 $1,267.44
CONNELL RESOURCES INC
[P.O. # 9140419]
2014 ASPHALT Jul-30-2014 $1,261.00
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $1,261.00
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt Jun-14-2016 $1,255.42
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Nov-18-2015 $1,252.48
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Dec-03-2015 $1,246.88
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Nov-03-2015 $1,245.83
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-19-2014 $1,242.87
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt Jun-14-2016 $1,236.97
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Sep-29-2015 $1,229.65
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Sep-29-2015 $1,228.56
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jul-08-2015 $1,219.69
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Aug-17-2015 $1,213.88
MARTIN MARIETTA MATERIALS
[P.O. # 1600188]
16768544 Jan-06-2016 $1,210.14
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Aug-19-2015 $1,202.26
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt May-05-2016 $1,200.48
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 Jun-01-2016 $1,198.02
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Aug-12-2015 $1,196.04
CONNELL RESOURCES INC
[P.O. # 1410064]
38753 Nov-10-2014 $1,182.92
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Sep-15-2015 $1,153.70
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Oct-27-2014 $1,149.47
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 Jun-14-2016 $1,131.19
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Jul-01-2014 $1,104.54
TRINITY ESC (ACH)
[P.O. # 9144059]
2014 MISC MATERIALS Jul-17-2014 $1,086.28
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt May-05-2015 $1,053.78
MARTIN MARIETTA MATERIALS
[P.O. # 1600188]
16768542 Jan-06-2016 $1,047.88
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Jul-17-2014 $1,043.48
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Oct-20-2015 $1,033.77
MARTIN MARIETTA MATERIALS
[P.O. # 1408949]
13952575 Oct-06-2014 $1,033.62
TRINITY ESC (ACH)
[P.O. # 9151089]
2015 MISC MATERIAL Feb-19-2015 $984.20
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Nov-03-2014 $934.38
TRINITY ESC (ACH)
[P.O. # 9152099]
2015 MISC MATERIAL Apr-09-2015 $914.20
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-25-2014 $904.89
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Nov-10-2014 $868.53
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $865.22
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Dec-14-2015 $837.47
TRINITY ESC (ACH)
[P.O. # 9161879]
2016 MATERIALS Mar-23-2016 $813.40
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Jul-01-2015 $808.01
CONNELL RESOURCES INC
[P.O. # 9150187]
2015 ASPHALT PER Aug-12-2015 $779.19
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Oct-20-2014 $775.07
TRINITY ESC (ACH)
[P.O. # 9152734]
2015 MISC MATERIAL May-11-2015 $748.30
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Jul-15-2015 $739.54
MORTENSON CONSTRUCTION
[P.O. # 9151772]
Old Town Square Construction Apr-05-2016 $725.50
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Dec-03-2015 $721.28
MARTIN MARIETTA MATERIALS
[P.O. # 1411232]
14408353 Dec-15-2014 $714.18
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Dec-14-2015 $707.58
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Aug-12-2015 $690.57
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Nov-18-2014 $683.22
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Nov-03-2014 $676.66
TRINITY ESC (ACH)
[P.O. # 9157012]
2015 MISC MATERIAL Nov-12-2015 $672.35
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Jul-21-2015 $661.50
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Dec-03-2015 $656.25
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jun-22-2015 $644.44
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Oct-20-2014 $640.21
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Aug-26-2015 $635.37
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt Apr-26-2016 $632.22
COBITCO INC
[P.O. # 9146124]
addendem to PO Oct-27-2014 $629.85
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Oct-27-2015 $629.56
COBITCO INC
[P.O. # 1408238]
00041263 Sep-15-2014 $617.10
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Dec-03-2015 $610.88
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Oct-13-2015 $608.81
COBITCO INC
[P.O. # 1408318]
00041310 Sep-17-2014 $597.80
COBITCO INC
[P.O. # 9144709]
2014 MATERIALS Aug-14-2014 $597.60
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Jul-28-2015 $597.60
COBITCO INC
[P.O. # 9152338]
2015 MATERIALS Apr-20-2015 $592.20
COBITCO INC
[P.O. # 9144060]
2014 MATERIALS Jul-17-2014 $590.40
COBITCO INC
[P.O. # 9144435]
2014 MATERIALS Aug-04-2014 $590.40
COBITCO INC
[P.O. # 9150796]
2015 MATERIALS Feb-03-2015 $587.50
COBITCO INC
[P.O. # 9151672]
2015 MATERIALS Mar-18-2015 $585.15
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Aug-17-2015 $580.59
COBITCO INC
[P.O. # 9152069]
2015 MATERIALS Apr-08-2015 $580.45
COBITCO INC
[P.O. # 9144342]
2014 MATERIALS Jul-30-2014 $578.10
COBITCO INC
[P.O. # 9153090]
2015 MATERIALS May-26-2015 $575.75
COBITCO INC
[P.O. # 9153986]
2015 MATERIALS Jul-01-2015 $575.75
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-17-2014 $572.16
COBITCO INC
[P.O. # 9151088]
2015 MATERIALS Feb-19-2015 $568.70
COBITCO INC
[P.O. # 9156815]
2015 MATERIALS Nov-03-2015 $568.70
COBITCO INC
[P.O. # 9152916]
2015 MATERIALS May-18-2015 $564.00
COBITCO INC
[P.O. # 9154470]
2015 MATERIALS Jul-22-2015 $564.00
COBITCO INC
[P.O. # 9156411]
2015 MATERIALS Oct-13-2015 $564.00
COBITCO INC
[P.O. # 9157013]
2015 MATERIALS Nov-12-2015 $564.00
COBITCO INC
[P.O. # 9151849]
2015 MATERIALS Apr-07-2015 $559.30
COBITCO INC
[P.O. # 9154996]
2015 MATERIALS Aug-12-2015 $559.30
COBITCO INC
[P.O. # 9155652]
2015 MATERIALS Sep-10-2015 $559.30
COBITCO INC
[P.O. # 9147255]
addendem to PO Dec-08-2014 $556.70
COBITCO INC
[P.O. # 9143747]
2014 MATERIALS Jul-01-2014 $554.60
COBITCO INC
[P.O. # 9151937]
2015 MATERIALS Apr-01-2015 $552.25
COBITCO INC
[P.O. # 9155141]
2015 MATERIALS Aug-18-2015 $552.25
COBITCO INC
[P.O. # 9146400]
addendem to PO Nov-03-2014 $550.80
COBITCO INC
[P.O. # 9152415]
2015 MATERIALS May-18-2015 $547.55
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Nov-03-2014 $545.92
TRINITY ESC (ACH)
[P.O. # 9155316]
2015 MISC MATERIAL Aug-26-2015 $545.65
COBITCO INC
[P.O. # 1408048]
00040993 Sep-10-2014 $545.31
COBITCO INC
[P.O. # 9151452]
2015 MATERIALS Mar-09-2015 $542.85
COBITCO INC
[P.O. # 9143880]
2014 MATERIALS Jul-09-2014 $542.80
TRINITY ESC (ACH)
[P.O. # 9145642]
2014 MISC MATERIALS Sep-29-2014 $542.77
MARTIN MARIETTA MATERIALS
[P.O. # 1600257]
16719966 Jan-07-2016 $540.34
TRINITY ESC (ACH)
[P.O. # 9155907]
2015 MISC MATERIAL Sep-21-2015 $536.90
TRINITY ESC (ACH)
[P.O. # 9154106]
2015 MISC MATERIAL Jul-08-2015 $536.55
COBITCO INC
[P.O. # 9153774]
2015 MATERIALS Jun-22-2015 $535.80
COBITCO INC
[P.O. # 9152479]
2015 MATERIALS Apr-27-2015 $531.10
COBITCO INC
[P.O. # 9154427]
2015 MATERIALS Jul-21-2015 $528.75
COBITCO INC
[P.O. # 9145999]
addendem to PO Oct-15-2014 $528.61
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Nov-03-2014 $521.55
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Dec-15-2015 $521.24
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Nov-10-2014 $515.46
COBITCO INC
[P.O. # 9155461]
2015 MATERIALS Sep-01-2015 $514.65
TRINITY ESC (ACH)
[P.O. # 9154637]
2015 MISC MATERIAL Jul-28-2015 $512.05
CONNELL RESOURCES INC
[P.O. # 9150187]
2015 ASPHALT PER Jul-21-2015 $494.96
TRINITY ESC (ACH)
[P.O. # 9144970]
2014 MISC MATERIALS Aug-27-2014 $490.47
CONNELL RESOURCES INC
[P.O. # 9140419]
2014 ASPHALT Oct-20-2014 $488.46
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT May-20-2015 $484.72
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-23-2014 $483.60
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Oct-20-2014 $478.59
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 Jun-20-2016 $460.02
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Jul-23-2014 $450.35
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Dec-08-2014 $440.48
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $435.03
TRINITY ESC (ACH)
[P.O. # 9146435]
2014 MISC MATERIALS Nov-03-2014 $431.22
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 Jan-13-2016 $424.55
COBITCO INC
[P.O. # 9163216]
2016 MATERIALS May-24-2016 $421.20
COBITCO INC
[P.O. # 9157508]
2015 MATERIALS Dec-08-2015 $419.58
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Sep-21-2015 $417.91
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt Jun-20-2016 $414.10
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Oct-21-2015 $408.17
COBITCO INC
[P.O. # 9162544]
2016 MATERIALS Apr-27-2016 $407.55
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-27-2014 $383.31
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 May-03-2016 $375.97
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 May-24-2016 $373.51
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Jul-17-2014 $368.71
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt May-18-2015 $346.94
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jul-01-2015 $345.29
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $338.24
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Sep-15-2015 $337.81
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 Jun-28-2016 $331.28
COBITCO INC
[P.O. # 9164151]
2016 MATERIALS Jun-28-2016 $327.04
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Sep-29-2015 $313.75
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt May-28-2015 $313.33
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT May-18-2015 $309.59
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT May-28-2015 $304.20
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Oct-20-2014 $300.85
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Dec-15-2015 $298.80
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT May-18-2015 $297.56
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Sep-29-2015 $291.75
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Jun-22-2015 $288.85
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt Jun-28-2016 $285.72
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt May-28-2015 $284.29
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt Jan-13-2016 $279.30
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT May-20-2015 $274.48
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jun-17-2015 $270.81
BRANNAN SAND & GRAVEL CO / REA
[P.O. # 1602169]
158321 Mar-07-2016 $270.05
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt Jun-14-2016 $266.09
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Dec-08-2014 $262.88
CONNELL RESOURCES INC
[P.O. # 9140419]
Asphalt Jul-30-2014 $237.58
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $237.58
MARTIN MARIETTA MATERIALS
[P.O. # 1411232]
14408351 Dec-15-2014 $235.24
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt May-24-2016 $231.65
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Sep-29-2015 $221.20
CONNELL RESOURCES INC
[P.O. # 9160264]
2016 ASPHALT-BID 7377 May-26-2016 $218.54
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt Jun-14-2016 $216.07
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt Jun-28-2016 $214.02
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Oct-09-2014 $212.93
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT May-18-2015 $211.24
MARTIN MARIETTA MATERIALS
[P.O. # 1411555]
14475360 Dec-23-2014 $210.87
CONNELL RESOURCES INC
[P.O. # 9160264]
Concrete & Asphalt May-24-2016 $210.87
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jul-01-2015 $210.41
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Oct-21-2015 $206.86
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Aug-17-2015 $205.38
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Oct-27-2014 $201.03
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt May-18-2015 $193.59
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jun-17-2015 $193.29
CONNELL RESOURCES INC
[P.O. # 9150187]
2015 ASPHALT PER Apr-13-2015 $192.01
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $192.00
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 Jun-14-2016 $187.78
CONNELL RESOURCES INC
[P.O. # 9140419]
Concrete & Asphalt Jul-30-2014 $182.29
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $182.29
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Oct-13-2015 $178.04
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Oct-21-2015 $177.31
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Dec-03-2015 $175.55
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Jul-17-2014 $173.32
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-20-2014 $173.19
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 May-24-2016 $168.51
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Dec-18-2014 $167.29
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Apr-06-2015 $167.29
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Jul-13-2015 $166.42
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Nov-03-2014 $159.44
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt May-03-2016 $158.67
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-10-2014 $156.51
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt May-24-2016 $154.98
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-20-2014 $154.86
CONNELL RESOURCES INC
[P.O. # 9140419]
2014 ASPHALT Nov-18-2014 $152.92
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Jul-21-2015 $147.66
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Aug-12-2015 $146.21
MARTIN MARIETTA MATERIALS
[P.O. # 1411232]
14408353 Dec-15-2014 $142.92
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-23-2014 $141.99
CONNELL RESOURCES INC
[P.O. # 9140419]
2014 ASPHALT Aug-05-2014 $140.26
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 May-26-2016 $140.22
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Jun-17-2015 $139.67
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Dec-03-2015 $138.25
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Jul-01-2014 $137.39
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Dec-14-2015 $135.71
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Apr-02-2015 $132.01
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Oct-13-2015 $131.97
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Aug-12-2015 $129.90
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Sep-10-2015 $128.65
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Dec-03-2015 $127.82
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 Apr-26-2016 $127.10
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Apr-22-2015 $125.75
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Oct-15-2015 $125.75
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Oct-21-2015 $125.75
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Oct-27-2015 $125.75
CONNELL RESOURCES INC
[P.O. # 9140419]
Concrete & Asphalt Jul-30-2014 $122.77
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $122.77
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Sep-21-2015 $121.18
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-19-2014 $118.40
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Jul-17-2014 $117.64
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Jun-22-2015 $115.37
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Jul-17-2014 $112.70
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Sep-16-2015 $111.22
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Dec-14-2015 $110.86
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 Jun-01-2016 $109.06
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Apr-22-2015 $106.25
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Nov-19-2015 $106.24
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Jul-28-2015 $102.92
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Jul-08-2015 $100.43
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Dec-23-2014 $99.82
CONNELL RESOURCES INC
[P.O. # 9140419]
2014 ASPHALT Jul-30-2014 $98.41
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $98.41
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Jul-08-2015 $97.53
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt May-20-2015 $97.52
CONNELL RESOURCES INC
[P.O. # 9150187]
2015 ASPHALT PER Aug-12-2015 $97.06
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Jul-17-2014 $95.27
CONNELL RESOURCES INC
[P.O. # 9140419]
Concrete & Asphalt Aug-05-2014 $94.48
CONNELL RESOURCES INC
[P.O. # 9140419]
2014 ASPHALT Jul-09-2014 $93.06
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jul-08-2015 $90.89
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Nov-13-2014 $88.64
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Sep-10-2015 $88.40
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Oct-27-2015 $87.57
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 May-24-2016 $84.46
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt May-20-2015 $84.25
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Oct-27-2014 $79.66
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Nov-12-2015 $78.85
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $75.90
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $75.90
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Oct-15-2014 $74.98
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-10-2014 $72.63
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Nov-12-2015 $71.80
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt May-28-2015 $70.97
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Oct-20-2014 $70.66
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jul-01-2015 $69.31
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-29-2014 $67.95
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt Apr-19-2016 $67.24
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt May-10-2016 $66.01
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 Apr-26-2016 $65.60
COBITCO INC
[P.O. # 9145998]
2014 MATERIALS Oct-15-2014 $65.54
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Sep-10-2015 $65.16
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt Jun-14-2016 $64.78
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Nov-03-2015 $64.54
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Nov-03-2015 $64.53
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt May-03-2016 $63.55
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
2016 ASPHALT-BID 7377 May-03-2016 $62.73
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt Apr-26-2016 $61.50
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt May-18-2015 $57.90
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt May-05-2015 $57.33
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Oct-09-2014 $56.03
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-25-2014 $55.02
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-10-2014 $54.51
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Jun-17-2015 $53.54
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Jul-01-2014 $53.43
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Aug-17-2015 $51.88
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Oct-13-2015 $51.88
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $51.45
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-10-2014 $51.08
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-10-2014 $50.61
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Nov-03-2014 $49.67
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Sep-29-2015 $47.73
CONNELL RESOURCES INC
[P.O. # 9140419]
Concrete & Asphalt Jul-30-2014 $46.86
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $46.86
CONNELL RESOURCES INC
[P.O. # 9140419]
Concrete & Asphalt Jul-30-2014 $45.80
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $45.80
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Jul-23-2014 $45.35
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jun-17-2015 $45.24
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Jul-15-2015 $45.24
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt May-18-2015 $44.82
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt May-28-2015 $42.75
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Oct-15-2015 $34.45
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Oct-20-2015 $34.45
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Sep-10-2014 $32.80
CONNELL RESOURCES INC
[P.O. # 9150187]
Concrete & Asphalt Apr-13-2015 $29.75
MARTIN MARIETTA MATERIALS
[P.O. # 9140423]
Concrete & Asphalt Aug-18-2014 $27.50
CONNELL RESOURCES INC
[P.O. # 9150187]
2015 ASPHALT PER Apr-02-2015 $25.42
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Aug-18-2015 $25.32
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Oct-13-2015 $25.32
MARTIN MARIETTA MATERIALS
[P.O. # 1600188]
16749031 Jan-06-2016 $23.66
DOWNTOWN ACE HARDWARE Quick concrete for Mulber Sep-30-2015 $23.47
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Dec-03-2015 $14.53
DOWNTOWN ACE HARDWARE concrete Sep-30-2015 $8.00
CONNELL RESOURCES INC
[P.O. # 9140419]
Concrete & Asphalt Jul-30-2014 $-45.80
CONNELL RESOURCES INC
[P.O. # 9140419]
Concrete & Asphalt Jul-30-2014 $-46.86
CONNELL RESOURCES INC
[P.O. # 9140419]
2014 ASPHALT Jul-30-2014 $-98.41
CONNELL RESOURCES INC
[P.O. # 9140419]
Concrete & Asphalt Jul-30-2014 $-122.77
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
Concrete & Asphalt Oct-21-2015 $-125.75
CONNELL RESOURCES INC
[P.O. # 9140419]
Concrete & Asphalt Jul-30-2014 $-182.29
CONNELL RESOURCES INC
[P.O. # 9140419]
Asphalt Jul-30-2014 $-237.58
CONNELL RESOURCES INC
[P.O. # 9140419]
2014 ASPHALT Jul-30-2014 $-1,261.00
CONNELL RESOURCES INC
[P.O. # 9140419]
Concrete & Asphalt Jul-30-2014 $-1,592.85
MARTIN MARIETTA MATERIALS
[P.O. # 9150643]
2015 ASPHALT Sep-16-2015 $-1,891.17
CONNELL RESOURCES INC
[P.O. # 9140419]
Asphalt Jul-30-2014 $-2,059.03
CONNELL RESOURCES INC
[P.O. # 9140419]
Asphalt Jul-30-2014 $-2,070.79
CONNELL RESOURCES INC
[P.O. # 9140419]
2014 ASPHALT Jul-30-2014 $-3,938.84
CONNELL RESOURCES INC
[P.O. # 9140419]
Concrete & Asphalt Jul-30-2014 $-4,249.74
MORTENSON CONSTRUCTION
[P.O. # 9151772]
Old Town Square Construction Aug-04-2015 $-14,510.00
CONNELL RESOURCES INC
[P.O. # 9140419]
2014 ASPHALT Jul-30-2014 $-14,520.49
VOGEL CONCRETE INC - VGL INC-
[P.O. # 9140734]
2014 Crack Seal Contract Dec-16-2014 $-112,564.70
MARTIN MARIETTA MATERIALS
[P.O. # 9160265]
Concrete & Asphalt May-03-2016 $-383,164.67
Total (of all records): $ 4,602,629.82